Zojila tunnel breakthrough: A game-changer for India's security and regional connectivity

Union Minister Nitin Gadkari oversaw the breakthrough of the 13.14-km-long Zojila tunnel, hailing it as a "game-changer" for India's national security and integration. The tunnel, located at an altitude of 11,578 feet, will provide all-weather connectivity between Jammu & Kashmir and Ladakh, significantly speeding up the movement of the Indian Army and supplies. Despite extreme snowfall and complex geological conditions, the project was completed at a cost of ₹6,800 crore, much lower than the initial estimate. It features unique safety measures, including modern ventilation, fire detection, CCTV surveillance, and cross-passage facilities, reducing travel time from two hours to 30 minutes.

Key Points

  • The 13.14-km-long Zojila tunnel has achieved a breakthrough, providing all-weather connectivity between Jammu & Kashmir and Ladakh.
  • It is deemed a "game-changer" for national security, facilitating faster and safer movement of the Indian Army and supplies.
  • The tunnel, located at 11,578 feet, is the world's longest single-tube, bi-directional road tunnel.
  • The project was completed at ₹6,800 crore, significantly below the initial estimate of ₹12,000 crore.
  • It incorporates advanced safety features and will reduce travel time from Sonamarg to Meenamarg to just 30 minutes.

Exam Facts

  • Tunnel name: Zojila tunnel.
  • Length: 13.14-km.
  • Altitude: 11,578 feet.
  • Cost: ₹6,800 crore (initial estimate ₹12,000 crore).
  • Connects: Jammu & Kashmir and Ladakh (specifically Sonamarg to Meenamarg).

Read it. Retain it. Recall it.

Get spaced-repetition flashcards, daily quizzes and offline access — free on Android.

Get it on Google Play

All current affairs of 10 June 2026